News Blog
Case Studies Testimonials
Resources Fuel Costs FAQs
Facebook
Twitter
LinkedIn
Google Plus
Pinterest
Tumblr
The Renewable Heat Experts Design | Supply | Installation | Maintenance.
07715 679045
martin@blakeecotec.co.uk
 
 
 
Biomass Heating Solar Heat Pumps
 

Case studies


Hill Top Farm benefit from Renewable Wood Chip Boiler solution Devon Farm have an ETA HACK 50kw Wood Chip boiler installed by Blake Ecotec, alongside a bespoke Wood Chip Agitator

The Client;
Mr. Daniel Webber.

The Property;
Hill Top Farm, Severn Crosses, Tiverton, Devon (Non-Domestic).

The Project Included;

  • ETA Hack 50 (13.6 to 49.5kW) Wood Chip Boiler System.
  • 1,000 litre Akvarterm accumulator tank.
  • 3.5 meter bespoke wood chip agitator – Customised from an existing grain silo.
  • Providing heat to two separate buildings.
  • Internet link up for remote control to allow the client to easily monitor boiler performance.
  • Full Project Management including design, installation, maintenance and RHI application.

Pay Back Period;
3-4 years.

RHI Payments;
A project of this size would gain approximately £189,000 in Government funded payments over the 20 year period.

Total Cost;
£36,600 including VAT.

The Project Requirement
Deep in the Devon countryside, the owners of Hill Top Farm, near Tiverton, were looking to make the switch to green energy by integrating an intelligent and renewable biomass solution to heat two buildings, minimise reliance on fossil fuels and reduce CO2 emissions.

Project Summary
Following detailed and in-depth discussions we designed and installed a 50kw ETA biomass boiler solution to supply heating and hot water to two separate dwellings on the farm. Alongside this we also fitted a 1,000 litre accumulator tank and customised an existing 3.5 m high Gain Silo to act as a bespoke Wood Chip Agitator.

Our experienced team designed, installed and commissioned the entire project, including the RHI application process. The solution works at 92% efficiency compared to the properties previous oil system which worked at only 80%. Mr. Webber also saves considerably on fuel costs; the biomass wood chip cost 2.7p per kilowatt of heat produced in comparison to a much higher 6p per kilowatt for the oil system.

Working with over 40 metres of underground pipe to connect the new Biomass Boiler to the properties, we also integrated an existing oil heating system and our engineers configured the system to allow the oil system to work as a fail safe. Both work efficiently and interchangeably at the touch of a button.

The Renewable Heat Incentive (RHI)
Hill Top Farm's 50kw ETA Biomass Boiler is compliant within the 20 year Non-Domestic Renewable Heat Incentive (RHI) scheme.

As well as delivering substantial net fuel cost savings of £114,385 over the 20 year scheme. Our installation will enable Mr. Webber to receive RHI payments of 8.6p per kWh of heat generated by the system through submitting quarterly meter readings to OFGEM.

The project will gain approximately £250,000 additional income over 20 years. The RHI payments and the fuel cost savings made have already seen the initial outlay paid off in just 3-4 years, making the project both sustainable and financially viable.



< Back to Case Studies

 
 
 

 

We supply and install a wide range of biomass boilers, biomass stoves, air source heat pumps and solar systems from manufacturers including:
ETAFrolingMCZ HeatingEco AngusGrantNordica Extra FlameVaillantPanasonic
Microgeneration Certification Scheme Approved Installer and NAPIT Approved Electrical InstallerGreen Deal Approved InstallerRenewable Energy Consumer CodeRenewable Energy Hub Approved Installer
 
We serve a wide area including Somerset and Devon, Exeter, Wellington, Taunton, Shepton Mallet, Street, Glastonbury, Wells, Frome, Minehead, Bridgwater, Weston-Super-Mare, Bristol, Dorset, Wiltshire and Cornwall.
Copyright 2014 Blake Ecotec. All Rights Reserved. Webrex Web Design.
Facebook Twitter Google PlusLinkedIn Pinterest Tumblr